Skip to main content
Loading…
This section is included in your selections.

a.All documents required for the submission of an expedited solar energy system application shall be made available on the City’s public website.

b.Electronic submittal of the required permit application and documents by email, facsimile, or other means authorized by the City’s Chief Building Official shall be made available to all small residential rooftop solar energy system permit applicants.

c.An applicant’s electronic signature shall be accepted on all forms, applications, and other documents in lieu of a wet signature.

d.The City’s Permits and Inspections Office shall adopt a standard plan and checklist of all requirements with which small residential rooftop solar energy systems shall comply to be eligible for expedited review. (Ord. 3520 § 2, 2015)