Skip to main content
Loading…
This section is included in your selections.

The subdivider shall submit to the Public Works Director 12 copies of the tentative map of the proposed subdivision, plus one reproducible transparency of the same, plus one transparency of the same reduced to eight inches by ten inches. (Ord. 3472 § 1, 2012; Ord. 3424 § 1, 2009)