Skip to main content
Loading…
This section is included in your selections.

Within 90 days of the date of the Public Works Director’s action on the preliminary map, the subdivider shall prepare and file a tentative map of the proposed subdivision. If an EIR is required, the subdivider shall also file the required deposit for the City’s preparation of an EIR. Failure to file the map within this time period shall invalidate any reports, recommendations or actions of the Public Works Director with respect to the preliminary map and, should the subdivision be resubmitted for consideration, a new preliminary map shall be filed in accord with the above procedures unless the Public Works Director shall determine that the original preliminary map is still valid and adequate. (Ord. 3472 § 1, 2012; Ord. 3429 § 1, 2009; Ord. 3424 § 1, 2009)