All excavations, refilling and resurfacing under this Article shall be made under the supervision and to the satisfaction of the Public Works Director and shall be conducted in such manner as to do the least possible damage to contiguous lands and improvements.

All such excavations shall be refilled by the applicant to the specifications of the City and resurfaced by a qualified licensed General Engineering contractor and inspected by City staff to the satisfaction of the Public Works Director. Public utilities, or contractors employed by such public utilities may, upon receipt of prior written permission from the Public Works Director, resurface such excavations, such work to be done to the satisfaction of the Public Works Director.

All public utility companies shall be responsible for any settlement of their trenches for a period of two (2) years following the date of final repaving, and shall make repairs during this period as directed by the Public Works Director. (Ord. 3472 § 1, 2012; Ord. 3424 § 1, 2009)